Australia InfoMine Home Page
Home News Companies Countries Suppliers Careers Library Maps
Investment Commodities Properties Equipment Consultants EduMine Technology Events
Blogs Mine Sites Mine Costs About Contact eStore Advertise Subscribe
 
SITE SEARCH
NewsMine - Mining news, news releases and editorials worldwideAustralia InfoMine
Mining news, news releases and editorials worldwide
Comprehensive mining news online every business day
Most recent Australian mining news

Page: 1 2 3 4 5

TECTONIC RESOURCES NL
Friday, November 06, 2009
Tectonic Resources announced the completion of the independent Scoping Study on its 100% owned Phillips River Project located in Western Australia. Highlights include: an annual production of 800,000 tonnes with a 7.5 year mine life, Gross cash generation Life of Mine of $823 million, Gross operating cost LOM of $540 million and Net cash generated over LOM of $283 million, an IRR of 40% with a Net cash after capital cost of $158 million pre tax.
Property: PHILLIPS RIVER
(Complete Text of Nov 6, 2009 News Release)
AUSSIE Q RESOURCES LIMITED
Friday, November 06, 2009
Aussie Q Resources announce drill results at Bucket Mountain and Bucket Mountain North prospects withib its 100% ownwd Kildare project in Queensland, Australia. Highlights include drill hole 09KD010 (Bucket Mountain North) intersecting 22.0 m grading 0.0408% molybdenum from 52.0 m, including 10 m grading 0.0571% molybdenum from 65 m and 2 m grading 0.1197% molybdenum from 65.0 m.
Property: KILDARE
(Complete Text of Nov 6, 2009 News Release)
GOLDMINCO CORPORATION
Friday, November 06, 2009
Goldminco announced an update on it’s recent exploration activities at the Tick Hill, Blayney and Temora projects in Australia. Highlights on the Tick Hill Project include the delineation of a 1 km x 200 m copper/gold/cobalt soil geochemical anomaly at the Spring Creek prospect. On the Blayney Project, a strong IP chargeability anomaly associated with a resistivity high was identified at the Bluebird prospect and an IP survey targeting structurally controlled copper/gold mineralised systems below the Tertiary basalt cover was commenced. On the Temora Project, an 8,000 m drill program is planned.
Property: BLAYNEY, DUTCHESS JV/TICK HILL and TEMORA
(Complete Text of Nov 6, 2009 News Release)
AUSSIE Q RESOURCES LIMITED
Friday, November 06, 2009
Aussie Q Resources announced results from 3 drill holes totaling 456 m drilling into the area at Whitewash South on EPM 14628. Drill Hole 09WW091, drilled at Whitewash South, 100m South of the previously reported drill hole 09WW090, has intersected a significant zone of Mo/Cu mineralization namely: 39m @ Mo 232 ppm, Cu 0.23% and Ag 2.6g/t including 7m @ Mo 366 ppm, Cu 0.33% and Ag 2.3g/t. Features of this hole include the apparent increase in copper grades as drilling moves south and east. Drill Hole 09WW091 also intersected an overlapping copper intersection of 78m at 0.2% Cu, 157 ppm Mo and 2.0g/t Ag including 27m at 0.23% Cu, 169 ppm Mo and 30m @ 0.22% Cu, 215 ppm Mo and 3.4g/t Ag Whitewash South is situated 500m south of the 71.5 million tonne Inferred Resource at Whitewash / Gordons. Potentially this new mineralization increasing the strike length of the Whitewash Mineralization by 600m to 1.9km.
Property: WHITEWASH-GORDON'S KNOB
(Complete Text of Sep 4, 2009 News Release)
REGENCY MINES PLC
Friday, November 06, 2009
Regency Mines plc announces the signing of a Joint Venture Agreement with Direct Nickel Pty Ltd ("DNi"), pursuant to the Memorandum of Understanding between the parties signed on 19 August 2009 and extended on 30 September 2009 ("JV"). Under the terms of the JV, the parties have agreed to co-operate on a 50/50 basis in the piloting and application of DNi's advanced nickel/cobalt leaching technology at Regency's Mambare lateritic nickel deposit in Papua New Guinea. Regency will agree to sell a 100% interest in its wholly owned subsidiary Canopus No 83 Limited, and in any other interests it may come to hold in the vicinity of the Mambare deposit, to a wholly owned subsidiary of DNi ("JVCo"), for a consideration consisting of redeemable convertible shares which will convert, on achievement of the objective of the JV, into a 50% interest in JVCo.
Property: MAMBARE
(Complete Text of Nov 6, 2009 News Release)
NGM RESOURCES LIMITED
Friday, November 06, 2009
NGM Resources reported further results from its second Niger drilling program. At Takardeit prospect, hole IND042 intersected 3.0 m grading 0.1231% U3O8 from 4.5 m. The drilling at the Takardeit North prospect has identified sandstone hosted mineralisation over a zone approximately 1,500 m northeast-southwest by 600m northwest-southeast and remains open to the south-west. Hole IND066 intersected 0.7 m grading 0.1820% U3O8.
Property: TIM MERSOI - NGM
(Complete Text of Nov 6, 2009 News Release)
EMU NICKEL PTY LTD and XSTRATA PLC
Friday, November 06, 2009
Emu Nickel announced that diamond drilling has been completed at the Emu Lake Joint Venture north-east of Kalgoorlie, Australia(Xstrata Nickel is earning 662/3% and and Emu Nickel NL earning 331/3%)). Assay results have been returned for ELD042A confirming the presence of a new nickel sulphide occurrence at Binti South, about 1 km south of the Binti Gossan. The hole intersected 0.21 m grading 6.32% nickel from 282.28 m and 1.57 m grading 1.14% nickel from 393.43 m including 0.45 m grading 2.67% nickel from 393.43m.
Property: EMU LAKE JV
(Complete Text of Nov 6, 2009 News Release)
FLINDERS MINES LIMITED
Friday, November 06, 2009
Flinders Mines Limited has urged the Federal Government to honour a three-year-old policy commitment to introduce a system of tax relief that could “make or break” Australia’s junior minerals exploration sector. Speaking today at the annual general meeting of Flinders Mines Limited, Chairman, Mr Robert Kennedy, said the time had come for the Government to fulfil a commitment, made by the Labor Party prior to the 2007 election, to introduce a flow-through share scheme to shield junior explorers from some of the significant capital risk of their operations.
(Complete Text of Nov 6, 2009 News Release)
OVERLAND RESOURCES LIMITED
Friday, November 06, 2009
Overland Resources announced heavy liquid separation (HLS) test results at its Yukon Base Metals project in Yukon Territory, Canada. Tests were performed on a representative 22kg composite sample of low grade material collected from the Andrew Zinc Deposit. The results of the HLS test work show that in all 3 cases (utilising various crush sizes) over 90% of the sample was rejected as waste while over 80% of the zinc metal was recovered. The Company intends revising the open pit mine model, incorporating the use of a Dense Media Separation beneficiation plant to process low grade material.
Property: YUKON PROJECT/ANDREW
(Complete Text of Nov 6, 2009 News Release)
INTEGRA MINING LIMITED
Friday, November 06, 2009
Integra Mining Limited announce high grade gold intercepts from the Salt Creek gold deposit at the company’s Randalls Gold Project, located approximately 60km south-east of Kalgoorlie, Western Australia. Recently received results from drilling the gold mineralised upper shale include 5 metres at 129 g/t gold including 1 metre at 627 g/t gold. Additionally, further drill results from the Salt Creek feeder structure have been received and include 19 metres at 4.42 g/t gold including 2 metres at 14.31 g/t gold and 42 metres at 3.04 g/t gold including 10 metres at 6.21 g/t gold.
Property: RANDALLS (SALT CREEK, RED DALE)
(Complete Text of Nov 6, 2009 News Release)

Page: 1 2 3 4 5

AUSTRALIAN NEWS ON THE WEB
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events
Blogs | Mine Sites | Mine Costs | About | Contact | eStore | Advertise | Subscribe
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy